System Installation Assessment (Standards and Signage)
Quiz Summary
0 of 8 Questions completed
Questions:
Information
You have already completed the quiz before. Hence you can not start it again.
Quiz is loading…
You must sign in or sign up to start the quiz.
You must first complete the following:
Results
Results
0 of 8 Questions answered correctly
Your time:
Time has elapsed
You have reached 0 of 0 point(s), (0)
Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)
Categories
- Not categorized 0%
- Review
- Answered
- Correct
- Incorrect
-
Question 1 of 8
1. Question
Question 1
Identify from the options below four up-to-date standards that you should either own or have access to when designing and installing grid-connected PV systems.
Select FOUR correct answers:
CorrectIncorrect -
Question 2 of 8
2. Question
Question 2
Identify, according to AS/NZS 5033:2021, what international standard crystalline silicon modules must comply with?
Select one:
CorrectIncorrect -
Question 3 of 8
3. Question
Question 3.1
You have just installed a LV 3kW system on a residential house.
The array is located on the roof, and the inverter is mounted on the inside wall of the garage. The switchboard for the house is located on the outside wall of the garage.
The system uses a disconnection point as its isolation method.
Match the following signs to their required location:
CorrectIncorrect -
Question 4 of 8
4. Question
Question 3.2
You have just installed a LV 3kW system on a residential house.
The array is located on the roof, and the inverter is mounted on the inside wall of the garage. The switchboard for the house is located on the outside wall of the garage.
The system uses a disconnection point as its isolation method.
Match the following signs to their required location:
CorrectIncorrect -
Question 5 of 8
5. Question
Question 3.3
You have just installed a LV 3kW system on a residential house.
The array is located on the roof, and the inverter is mounted on the inside wall of the garage. The switchboard for the house is located on the outside wall of the garage.
The system uses a disconnection point as its isolation method.
Match the following signs to their required location:
CorrectIncorrect -
Question 6 of 8
6. Question
Question 4
You’re installing a system that uses microinverters. What extra letters do you need on your green PV sign?
CorrectIncorrect -
Question 7 of 8
7. Question
Question 5
You’re installing a system that uses a rooftop isolator. What extra letters do you need on your green PV sign?
CorrectIncorrect -
Question 8 of 8
8. Question
Question 6
You’re installing a system that uses a disconnection point. What extra letters do you need on your green PV sign?