Preparing for the Installation Assessment
Quiz Summary
0 of 28 Questions completed
Questions:
Information
You have already completed the quiz before. Hence you can not start it again.
Quiz is loading…
You must sign in or sign up to start the quiz.
You must first complete the following:
Results
Results
0 of 28 Questions answered correctly
Your time:
Time has elapsed
You have reached 0 of 0 point(s), (0)
Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)
Categories
- Not categorized 0%
- Review
- Answered
- Correct
- Incorrect
-
Question 1 of 28
1. Question
Question 1.1
The paragraph below is an email to be sent to a customer for a large residential system. Fill up the blanks with the appropriate information.
CorrectIncorrect -
Question 2 of 28
2. Question
Question 1.2
The paragraph below is an email to be sent to a customer for a large residential system. Fill up the blanks with the appropriate information.
CorrectIncorrect -
Question 3 of 28
3. Question
Question 1.3
The paragraph below is an email to be sent to a customer for a large residential system. Fill up the blanks with the appropriate information.
CorrectIncorrect -
Question 4 of 28
4. Question
Question 2
An individual who only holds a grid-connect solar PV (GCPV) design accreditation can design a battery storage system which is connected to the grid.
True/False?
CorrectIncorrect -
Question 5 of 28
5. Question
Question 3.1

Shading may significantly impact the energy yield of a PV system, particularly if it consists of a single string (see image above). For each of the SLDs below, select the corresponding design method which mitigates shading.

Which design method mitigates shading for SLD-1?
CorrectIncorrect -
Question 6 of 28
6. Question
Question 3.2

Shading may significantly impact the energy yield of a PV system, particularly if it consists of a single string (see image above). For each of the SLDs below, select the corresponding design method which mitigates shading.

Which corresponding design method mitigates shading for SLD-2?
CorrectIncorrect -
Question 7 of 28
7. Question
Question 3.3

Shading may significantly impact the energy yield of a PV system, particularly if it consists of a single string (see image above). For each of the SLDs below, select the corresponding design method which mitigates shading.

Which corresponding design method mitigates shading for SLD-3?
CorrectIncorrect -
Question 8 of 28
8. Question
Question 4
Having less voltage drop will result in having an increased output from the PV system. There are multiple ways to achieve low voltage drop.
Which of the following is not an option to minimize the voltage drop in a PV system?Select one:
CorrectIncorrect -
Question 9 of 28
9. Question
Question 5
In the absence of an installer during the entire installation of the system, there are three main stages that the installer has to attend at a minimum.
Select the THREE correct stages.
CorrectIncorrect -
Question 10 of 28
10. Question
Question 6.1
For each of the following tasks, identify which stakeholder is responsible.
Receive the information gathered by the site surveyor and prepare a detailed design in consultation with the site surveyor and the occupant.
CorrectIncorrect -
Question 11 of 28
11. Question
Question 6.2
For each of the following tasks, identify which stakeholder is responsible.
Complete the testing/commissioning information in the system manual and give the manual to the occupant.
CorrectIncorrect -
Question 12 of 28
12. Question
Question 6.3
For each of the following tasks, identify which stakeholder is responsible.
Consult with the occupant to determine the requirements/drivers for installing a system.
CorrectIncorrect -
Question 13 of 28
13. Question
Question 6.4
For each of the following tasks, identify which stakeholder is responsible.
Install the system according to the designer’s documentation.
CorrectIncorrect -
Question 14 of 28
14. Question
Question 6.5
For each of the following tasks, identify which stakeholder is responsible.
Contact the occupant to arrange a suitable time for the site survey.
CorrectIncorrect -
Question 15 of 28
15. Question
Question 6.6
For each of the following tasks, identify which stakeholder is responsible.
Prepare a System Manual to be given to the owner upon installation.
CorrectIncorrect -
Question 16 of 28
16. Question
Question 6.7
For each of the following tasks, identify which stakeholder is responsible.
Document all the information necessary for the detailed design to be prepared
CorrectIncorrect -
Question 17 of 28
17. Question
Question 6.8
For each of the following tasks, identify which stakeholder is responsible.
Identify and document all WHS issues for the site in order for control measures to be determined.
CorrectIncorrect -
Question 18 of 28
18. Question
Question 6.9
For each of the following tasks, identify which stakeholder is responsible.
Test and commission the system according to AS/NZS standards, DNSP (Distributed Network Service Provider) and industry (CEC) requirements.
CorrectIncorrect -
Question 19 of 28
19. Question
Question 6.10
For each of the following tasks, identify which stakeholder is responsible.
Prepare all required documentation and drawings for the installer.
CorrectIncorrect -
Question 20 of 28
20. Question
Question 7
Which solar panel mounting system will have the least environmental impact?
Choose one:
CorrectIncorrect -
Question 21 of 28
21. Question
Question 8.1
i) Can a grid-connected PV system be installed on a heritage site without a Development Application (DA) to the local council?
Yes/No
CorrectIncorrect -
Question 22 of 28
22. Question
Question 8.2
ii) Does a flush mounted system on a structurally sound building on a minor road typically require a Development Application (DA)?
Yes/No
CorrectIncorrect -
Question 23 of 28
23. Question
Question 9
In NSW, what is the maximum area a ground-mounted PV system can cover as an exempt development?
CorrectIncorrect -
Question 24 of 28
24. Question
Question 10
In NSW, what is the maximum energy storage capacity for a small-scale battery system to be an exempt development?
CorrectIncorrect -
Question 25 of 28
25. Question
Question 1
Organise the steps below on the installation process:
Sort elements
- The customer requests a project and quote
- Site assessment is done
- DNSP application process starts
- Installation starts
- Customer receives as-built system’s documentation
-
1
-
2
-
3
-
4
-
5
CorrectIncorrect -
Question 26 of 28
26. Question
Question 12.1
Match the following electrical symbols with their correct label.
CorrectIncorrect -
Question 27 of 28
27. Question
Question 12.2
Match the following electrical symbols with their correct label.
CorrectIncorrect -
Question 28 of 28
28. Question
Question 13
Which of the steps below require communication between the design/install team and the customer?
Select one:
CorrectIncorrect
