Part 6 of 8 – Signage
Attempts allowed: 4
Grading method: Highest grade
Quiz Summary
0 of 2 Questions completed
Questions:
Information
You have already completed the quiz before. Hence you can not start it again.
Quiz is loading…
You must sign in or sign up to start the quiz.
You must first complete the following:
Results
Results
0 of 2 Questions answered correctly
Your time:
Time has elapsed
You have reached 0 of 0 point(s), (0)
Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)
Categories
- Not categorized 0%
- Review
- Answered
- Correct
- Incorrect
-
Question 1 of 2
1. Question
Determine whether the following signs are required for the installed PV System. If they are required also select the location of the sign otherwise select not required. Refer to section 5 in AS/NZS 5033:2021.
Assumptions:
- PV DC cables are installed directly behind and adjacent to the PV Modules
- Disconnections points are used and installed in the ceiling space.
CorrectIncorrect -
Question 2 of 2
2. Question
Determine whether the following signs are required for the installed BESS. If they are required also select the location of the sign otherwise select not required. Refer to section 7 in AS/NZS 5139:2019 and section 10.10 in the textbook.
CorrectIncorrect
