Part 6 of 7 – Financial analysis and the bill of materials
Attempts allowed: 4
Grading method: Highest grade
Grade to pass: 27.00 out of 27.00
Quiz Summary
0 of 3 Questions completed
Questions:
Information
You have already completed the quiz before. Hence you can not start it again.
Quiz is loading…
You must sign in or sign up to start the quiz.
You must first complete the following:
Results
Results
0 of 3 Questions answered correctly
Your time:
Time has elapsed
You have reached 0 of 0 point(s), (0)
Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)
Categories
- Not categorized 0%
- Review
- Answered
- Correct
- Incorrect
-
Question 1 of 3
1. Question
Question 1
If you selected:
-
Tesla Powerwall 2 = $15,000
-
Tesla Gateway = $19,000
-
Meter = $2,900
-
AC Cable = $60 (×3)
-
DC Cable = $65 (×3)
-
Conduit = $180 (×3)
-
DC Isolator = $9,800 (×3)
What is the total cost of installation?
-
Answer:
CorrectIncorrect -
-
Question 2 of 3
2. Question
Question 2
If the Smiths consume 10.375 kWh daily and the battery performs peak-load arbitrage for 280 days a year, and the savings is (Grid tariff – Feed-in tariff),
with tariffs: 0.54 – 0.08 = 0.46,
what is the total estimated annual savings?- Refer to the project brief for grid tariff costs.
- The Smiths consume 10.375 kWh from the load assessment in part 1.
- Assume the battery has enough charge to perform arbitrage for 280 days of the year.
- For this calculation do not include any efficiency losses an estimate is fine.
-
Answer:
CorrectIncorrect -
Question 3 of 3
3. Question
Question 3
If the total installation cost is $67,115 and your estimated annual savings is $1,347.90, what is the simple payback period?
(Round your answer to two decimal places.)-