System Commissioning Assessment
Quiz Summary
0 of 5 Questions completed
Questions:
Information
You have already completed the quiz before. Hence you can not start it again.
Quiz is loading…
You must sign in or sign up to start the quiz.
You must first complete the following:
Results
Results
0 of 5 Questions answered correctly
Your time:
Time has elapsed
You have reached 0 of 0 point(s), (0)
Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)
Categories
- Not categorized 0%
- Review
- Answered
- Correct
- Incorrect
-
Question 1 of 5
1. Question
Question 1
Identify where, in general, you would begin commissioning a system.
Select one:
CorrectIncorrect -
Question 2 of 5
2. Question
Question 2
When starting up a grid-connected PV system, identify which isolator(s)/circuit breaker(s) should be switched on first.
Select one:
CorrectIncorrect -
Question 3 of 5
3. Question
Question 3
Given the sign of the shutdown procedure below and knowledge of typical grid-connected PV system isolation procedures, select the correct order of the procedure for 2 steps.
CorrectIncorrect -
Question 4 of 5
4. Question
Question 4
In the case that the PV system includes fuses, they can be removed from the fuse holders if the AC disconnector and DC disconnector are closed (‘on’ position)
True/False?
CorrectIncorrect -
Question 5 of 5
5. Question
Question 5
Which of the following methods can be used to check that the inverter is operating?
Choose TWO correct answers