UEERE0061 Gap Assessment
The necessary gap assessment to issue UEERE0061 units is covered by the following assessment questions. You need to achieve a grade of 100% to pass this assessment.
You will have up to 4 attempts to initially work through each assessment. After the 4th attempt, your assessment will be temporarily paused. A tutor will review your assessment attempts and provide you with feedback before allowing access for further attempts.
If you are not sure about any of the answers, please refer to the UEERE0061 Gap Assessment Book which contains the corresponding training content.
Once you have answered the question on the page, you can save your answer by clicking ‘Next’.
To see any previous attempts, click on ‘Review’ next to the attempt you wish to look at.
To start the assessment questions, click on ‘Attempt Quiz Now’.
Quiz Summary
0 of 27 Questions completed
Questions:
Information
You have already completed the quiz before. Hence you can not start it again.
Quiz is loading…
You must sign in or sign up to start the quiz.
You must first complete the following:
Results
Results
0 of 27 Questions answered correctly
Your time:
Time has elapsed
You have reached 0 of 0 point(s), (0)
Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)
Categories
- Not categorized 0%
- Review
- Answered
- Correct
- Incorrect
-
Question 1 of 27
1. Question
Question 1
For the site pictured below match three relevant WH&S issues that should be addressed with their corresponding solutions before starting the installation.

Sort elements
- Wear gloves
- Appropriate clothing, sunglasses, sunscreen
- Secure ladders & fall/edge protection in accordance with Safe Work Australia
-
Thermal burns
-
Solar exposure
-
Working from heights
CorrectIncorrect -
Question 2 of 27
2. Question
Question 2
Complete the table below with the suitable word or description to match the heading.
Choose from:
- Cuts
- Use hard hats
- Working underneath structure
- Lifting heavy equipment
- Wear suitable gloves
CorrectIncorrect -
Question 3 of 27
3. Question
Question 3
Match the associated WH&S regulators for each state in Australia:
Sort elements
- WorkSafe ACT
- SafeWork NSW
- NT WorkSafe
- SafeWork SA
- WorkSafe Tasmania
- Workplace Health and Safety Queensland
- WorkSafe Victoria
- WorkSafe WA
-
Australian Capital Territory
-
New South Wales
-
Northern Territory
-
South Australia
-
Tasmania
-
Queensland
-
Victoria
-
Western Australia
CorrectIncorrect -
Question 4 of 27
4. Question
Question 4
To prevent the risk of falls, WH&S regulators are preferring the use of what type of safety control measure: (choose one)
CorrectIncorrect -
Question 5 of 27
5. Question
Question 5
What 4 standards apply to grid connectd PV?
Select all of the correct answers:
CorrectIncorrect -
Question 6 of 27
6. Question
Question 6
What international standard will you find printed on an above ground DC cable to indicate it meets the required standard? (choose 1)
CorrectIncorrect -
Question 7 of 27
7. Question
Question 7
What are three stages a licenced installer must be present for during an installation.
CorrectIncorrect -
Question 8 of 27
8. Question
Question 8.1
For each of the following tasks, identify which stakeholder is responsible.
Answers: Site Surveyor, Occupant, Designer, Installer, Not requiredCorrectIncorrect -
Question 9 of 27
9. Question
Question 8.2
For each of the following tasks, identify which stakeholder is responsible.
Answers: Site Surveyor, Occupant, Designer, Installer, Not requiredCorrectIncorrect -
Question 10 of 27
10. Question
Question 8.3
For each of the following tasks, identify which stakeholder is responsible.
Answers: Site Surveyor, Occupant, Designer, Installer, Not requiredCorrectIncorrect -
Question 11 of 27
11. Question
Question 8.4
For each of the following tasks, identify which stakeholder is responsible.
Answers: Site Surveyor, Occupant, Designer, Installer, Not requiredCorrectIncorrect -
Question 12 of 27
12. Question
Question 8.5
For each of the following tasks, identify which stakeholder is responsible.
Answers: Site Surveyor, Occupant, Designer, Installer, Not requiredCorrectIncorrect -
Question 13 of 27
13. Question
Question 8.6
For each of the following tasks, identify which stakeholder is responsible.
Answers: Site Surveyor, Occupant, Designer, Installer, Not requiredCorrectIncorrect -
Question 14 of 27
14. Question
Question 8.7
For each of the following tasks, identify which stakeholder is responsible.
Answers: Site Surveyor, Occupant, Designer, Installer, Not requiredCorrectIncorrect -
Question 15 of 27
15. Question
Question 8.8
For each of the following tasks, identify which stakeholder is responsible.
Answers: Site Surveyor, Occupant, Designer, Installer, Not requiredCorrectIncorrect -
Question 16 of 27
16. Question
Question 9
To ensure that all solar cells specifications are given for equivalent rating conditions, a set of standard reference conditions are used for this rating – what are they?
Distinguish from the list below (choose 3).Select all the correct answers:
CorrectIncorrect -
Question 17 of 27
17. Question
Question 10
Label each of the graphs with the type of mounting system:
- Fixed
- Dual tracking
- Single tracking
Sort elements
- Fixed
- Dual tracking
- Single tracking
CorrectIncorrect -
Question 18 of 27
18. Question
Question 11
Fill in the blanks.
CorrectIncorrect -
Question 19 of 27
19. Question
Question 12
Fill the gaps choosing from the options provided.
CorrectIncorrect -
Question 20 of 27
20. Question
Question 13
An installer decides to install a cable between 1 – 1.5m horizontally from the external wall. Which of the following statements are compliant with the AS/NZS 5033:2021 requirements?
CorrectIncorrect -
Question 21 of 27
21. Question
Question 14
What is the minimum required rating of indoor enclosures containing conductor terminations as per AS 5633:2021?
CorrectIncorrect -
Question 22 of 27
22. Question
Question 15
What is the minimum required rating of outdoor enclosures containing conductor terminations as per 5033:2021?
CorrectIncorrect -
Question 23 of 27
23. Question
Question 16
According to Clause 4.4.7.2 in AS/NZS 5033:2021, when is top-down entry allowed for enclosures containing conductor terminations?
CorrectIncorrect -
Question 24 of 27
24. Question
Question 17
When is a drain device required?
CorrectIncorrect -
Question 25 of 27
25. Question
Question 18
When is a drip loop required?
CorrectIncorrect -
Question 26 of 27
26. Question
Question 19
Complete the following sentences by inserting the correct word or numbers from the drop down list.
CorrectIncorrect -
Question 27 of 27
27. Question
Question 20
Determine which each of the following statements are True. Choose 5